
Sicily to Trieste 2027
South to north through the Strait of Messina and the length of the Adriatic — a continuous offshore passage aboard Nene.
*Provisional and weather dependent
Read the briefingThis site gives the crew a clear overview of the passage, route, watch system, weather process, safety expectations and emergency procedures. It is designed to be easy to revisit before and during the voyage without replacing the formal passage plan or onboard navigation procedures.
For immediate updates, travel arrangements and last-minute information, use the crew WhatsApp group.
Route
Portorosa → Trieste
Distance
~690 nm
Duration
5–8 days
Provisioning
10 days
Crew
5
Departure
22 May 2027
Provisional / weather dependent
Optional stop
Brindisi
Fuel planning
Possible stops around
Crotone · Santa Maria di Leuca · Manfredonia · Ancona
The skipper retains absolute authority to delay departure, change the route, seek shelter or abandon the passage at any time.

Five crew. Three seas. One continuous passage north.
Departure from Portorosa.
Proceed toward the Strait of Messina.
Transit the strait with close attention to tidal stream, VTS, traffic, TSS, ferries and local conditions.
After clearing the strait, continue south along Calabria, round the toe of Italy and proceed toward Santa Maria di Leuca.
From Santa Maria di Leuca, routing north depends on prevailing weather. If conditions are broadly equal, preference is to remain on the Italian side.
Brindisi is the preferred optional overnight stop if progress and conditions make stopping worthwhile.
“The plan is a framework. The sea, weather and condition of the crew determine the actual passage.”
Intended planning route from Portorosa through the Messina Strait pilotage to WP0 and on to Trieste. Tap a waypoint or port for details.
The route shown is the intended planning route only and is not a substitute for onboard navigation, current charts, Notices to Mariners or the skipper's decisions.

Portorosa to Trieste — around 690 nautical miles of open water.
Each watch is structured so that developing crew operate with experienced support. The skipper remains outside the routine watch rotation and is available whenever required.
01
Mark
Captain / Skipper
02
Marcus
Chief Officer
03
Jon
Second Officer
04
Ian
Third Officer
05
Dorant
Deckhand Trainee

Rolling rota from the passage plan — to be confirmed before departure. The timeline will show each crew member's on-watch, pre-watch, rest and available periods once the approved schedule is entered.
There is never a bad reason to call the skipper.
The skipper would always rather be woken unnecessarily than called too late.
Live route conditions — for situational awareness only
Live conditions on this site do not replace the formal weather-monitoring process.
Portorosa
Loading…
Messina
Loading…
Santa Maria di Leuca
Loading…
Brindisi
Loading…
Central Adriatic
Loading…
Trieste
Loading…
Model data via Open-Meteo · wind at 10 m
Platform: PredictWind · Cross-check: Windy
Forecast gusts should not exceed 28 knots and there should be no significant deterioration forecast during the early stage of the passage.
This is a planning criterion, not an automatic go / no-go rule. The departure decision rests with the skipper, taking the full forecast picture, vessel and crew into account.

Paper chart, electronic plot and a good lookout.

Safety
Lifejackets and tethers are mandatory:
Harbour details are confirmed before departure. Unknown information is shown as such rather than estimated.

The boat will be provisioned for 10 days for five crew, despite the expected passage duration being 5–8 days.
Conservative fuel planning throughout.
Final water capacity to be confirmed following installation of the new tanks.
For reference only. Ticks are not saved.
March 2027
A crew training weekend is being planned for March 2027. The aim is to rehearse boat systems, watchkeeping, safety procedures, emergency drills and working together as a crew before the passage.
See the crew WhatsApp group for dates, arrangements and the latest information.